Construction Process
I'm needing new service what do I do first?
How much will construction cost?
Do I need to pay all costs upfront?
How do I know where my job is in the electrical
construction process?
How far away do I need to build from a power pole?
Will PEC install a new meter & service to my new shop
building?
Can PEC move existing overhead or underground lines?
Will PEC set my temporary pole for construction?
How can I get underground service?
Do I purchase my own meter base?
Is there a charge for setting a pole for a security
light?
Can I have an on/off switch placed on a security
light?
I'm needing new service what do I do first?
Contact
PEC at (580) 332-3031 or toll free within our service area at
1-877-456-3031 to discuss your needs with a PEC Representative. Your
Representative will ask for your legal description and name of
closest neighbor along with information about the size and type of
home you will build. If anything about your job changes after this
initial call (such as site location, size of equipment, etc.) please
contact your PEC Representative. (top)
How much will construction cost?
A PEC Staking
Engineer will visit your location to discuss building location, type
of service, terrain, and other factors that may influence the cost
of construction. This is a free service provided by PEC so we may
provide you with an accurate quote of building your service. PEC
may provide a credit toward this cost. See below for more
information.
(top)
Do I need to pay all costs upfront?
People’s Electric
Cooperative may provide a credit of up to $1800 to offset a portion
of the cost
of constructing power lines to a new residence.
Here’s how it
works:
- Up to
$1800 of your payment for the new power line will be set aside
in a Construction Deposit account. Note: You can avoid paying
this Construction Deposit if you meet the permanent requirements
prior to construction (see below).
- If,
within the term of the contract date, the permanent requirements
are met at the residence, the amount (plus interest) set aside
in the construction deposit account will be refunded to you as
long as the construction deposit is paid up front and is not on
an approved pay-out plan.
The following
permanent requirements must be met to avoid a construction deposit
or to receive a refund:
- The
member must be the landowner.
- Water must be
installed (city, rural, well, or water tap fee paid receipt).
- Sewer
must be installed (city, septic, lagoon, or copy of a perk
test).
- A
stationary foundation must be completed (poured concrete slab or
piers).
-
Occupancy of the dwelling will be permanent and year- round
(residence).
Mobile homes must
meet the criteria below:
- #’s 1,
2, 3, and 5 from above.
- Tongue,
wheels and axles must be removed.
Note: Once
permanent requirements are met, the member must contact Customer
Service at (580) 332-3031 or (877) 456-3031, to request a refund.
Please note that this section applies to construction costs and not
membership fees, meter deposits, or requested products and services,
if applicable.
(top)
How far away do I need to build from a power pole?
For your safety, PEC
recommends to build at least the length of a
power pole (around 40 feet).
(top)
How do I know where my job is in the electrical construction
process?
PEC Representatives are
updated twice each week as to the status of each job. Due to
the pre-construction process, however, PEC Representatives will NOT
have any information on your job until 4 weeks after we receive your
documents and payment for construction. Please feel free to
contact us any time after the pre-construction 4-week process for a
status update of your job.
(top)
Will PEC install a new meter & service to my new shop building?
Yes. Contact your PEC Representative to schedule new service.
(top)
Can PEC move existing overhead or underground lines
at the customer's expense?
Contact your PEC
Representative to schedule and plan for moving of lines.
(top)
Will PEC set my temporary pole for construction?
Each customer is responsible
for setting his or her temporary pole.
Click here to view
temporary pole guidelines.
(top)
How can I get underground service?
After PEC determines your
need for underground service and temporary service is complete,
please have the appropriate service entrance installed. Once
your electrician has completed this task, contact your PEC
Representative to schedule underground service.
(top)
Do I purchase my own meter base?
PEC will supply the meter
base at no charge. However, PEC will not supply the meter base
for a temporary pole. Meter bases can be picked up at PEC's
offices. (top)
Is there a charge for setting a pole for a security
light?
Customers in good standing
with the Cooperative pay nothing for new security light poles.
Customer who have a history of late payment may post a $500 pole
deposit. (top)
Can I have an on/off switch placed on a security
light?
Yes. An on/off switch
is $75.00 and can be added to your electric bill. A PEC Line
Technician will install this device. The standard security
light kilowatt hours will apply.
(top)
|